WARNING
1. Always check that the circuit breaker in the electrical panel is in the
OFF position, and that all high voltage circuits (more than 42.4V) are
completely isolated from the mains supply before doing any work.
2. Ensure that all low voltage systems (Less than 42.4V) are suitably
protected from damage, by disconnecting all sources of power such
as chargers and batteries before doing any work.
3. All electrical work must be carried out according to the requirements
of all applicable local electrical codes. (It is recommended that a
licensed electrical contractor perform such work.)
1. Ensure all interconnecting cables are securely in place (See diagrams on page
44 & 45).
2. Ensure single phase mains power is connected to the inverter (See diagram on
page 45).
Programming the gate limits
3. Disengage the manual release lever, move the gate to the middle of travel, and re-
engage the manual release lever.
4. Flip out the controller PCB as shown on page 31.
Connect all wiring
Get into programming mode
5. Fit the SET link jumper to the SET pins shown in Figure 23.
6. Press and release the RESET button. The STATUS light will flash five times. The
SET and L2 lights will now be on. Your are now in programming mode.
(See Fault Finder's Guide step 6)
NB: In case of the rack being underneath the pinion, first select inverted rack
option (See Menu Item 16 on page 50)
7. Press and hold the TEST pushbutton (Figure 23) down, for one flash of L1, and
then release. L2 will go off, and L1 will now be flashing once per second.
8. Determine right or left hand opening (as viewed from the release handle side of
the motor). Again press and hold the TEST button, but this time monitor the
STATUS light. Release the TEST button after ONE flash if gate opens to the
right, or TWO Flashes if gate opens to the left.
9. The gate will begin to slowly open (If the gate starts to close, see Fault Finders
Guide, page 39, step 9).